TM 9-2320-211-20-3-2
SPRINGS AND SHOCK ABSORBERS GROUP MAINTENANCE
Section 1. SCOPE
16-1. EQUIPMENT ITEMS COVERED . This chapter gives equipment maintenance pro-
cedures for springs and shock absorbers for which there are authorized corrective
maintenance tasks at the organizational maintenance level.
maintenance is authorized at the organizational maintenance level are covered in this
chapter.
Section II. SPRINGS
NOTE
This task is the same for the left and right
front springs. This task is shown for the
left front spring.
1 5/16-inch wrench
TOOLS :
Medium ballpeen hammer
Brass drift
3/4-inch wrench (2)
7/16-inch wrench
Pry bar
1 5/16-inch socket wrench
6-inch pliers
Hydraulic floor jack
Motor vehicle trestle
Torque wrench, 600 pound-
feet capacity
Wood block, 12 x 12 x 24-inches
(4)
Screwdriver bit
None
SUPPLIES :
PERSONNEL : Two
EQUIPMENT
CONDITION:
Truck parked, engine off, handbrake set, rear
wheels chocked.
a.
Preliminary Procedures.
(1) Remove shock absorber. Refer to para 16-6.
(2) Remove drag link. Refer to para 14-6.
|