Click here to make tpub.com your Home Page

Page Title: Section III. PINTLES AND TOWING ATTACHMENTS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-2
Section III. PINTLES AND TOWING ATTACHMENTS
15-4. TOWING PINTLE ASSEMBLY REMOVAL AND REPLACEMENT.
TOOLS: 9/32-inch wrench
1 1/8-inch wrench
7/16-inch wrench
Transmission jack
3/4-inch wrench
Pliers
15/16-inch wrench
SUPPLIES: None
PERSONNEL: TWO
EQUIPMENT CONDITION: Truck parked, engine off, handbrake set.
Removal.
FRAME
1
Soldier A 1.
Hold bolts (1) with 7/16-inch wrench.
Soldier B 2.
Working inside of frame of truck and using 7/16-inch wrench,
unscrew and take off four nuts (2) and lockwashers (3).
Soldier A 3.  Take out four bolts (1) and cover (4). Take off retainer plate
(5). Pull out connector (6) and unscrew coupling (7). Take
off connector (6).
GO TO FRAME 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business