|
|
TM 9-2320-211-20-3-2
REPLACEMENT.
Pipe wrench
TOOLS: Pliers
1 5/16-inch socket wrench
15/16-inch wrench (2)
Ratchet handle
Tie rod end puller
Small hammer
Puller kit
Chisel
SUPPLIES: None
PERSONNEL: One
EQUIPMENT CONDITION: Truck parked on level surface, engine off, handbrake
set.
a. Removal of Tie Rod Assembly.
FRAME 1
Jack up and support front axle housing. Refer to Part 1, para 10-3.
1.
2.
Using pliers, take out cotter pin (1).
3.
Using 1 5/16-inch socket wrench with ratchet handle, unscrew and take
off nut (2).
4. Using puller, take tie rod end (3) out of steering knuckle (4). If necessary,
using hammer, hit steering knuckle to loosen tie rod end. Do not drop loose
parts on tie rod end.
5. Screw nut (2) onto ball stud (5).
6. Do steps 2 through 5 again for other end of tie rod assembly (6).
7. Take out tie rod assembly (6).
END OF TASK
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |