Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-1
Using 7/16-inch wrench, unscrew upper bleeding screw (1) 3/4 turn. Look
1.
for air bubbles in hydraulic fluid in container (2).
2.
When there are no air bubbles for five seconds, using 7/16-inch wrench,
tighten upper bleeding screw (1).  Make sure that upper bleeding screw is
screwed on tightly.
3.
Take bleeding hose (3) and 7/16-inch wrench off of upper bleeding screw (1)
and put them on lower bleeding screw (4).
GO TO FRAME 3
12-93

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business