Click here to make tpub.com your Home Page

Page Title: CHAPTER 7. ELECTRICAL SYSTEM GROUP MAINTENANCE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-211-20-3-1
ELECTRICAL SYSTEM GROUP MAINTENANCE
Section I. SCOPE
7-1. EQUIPMENT ITEMS COVERED. This chapter gives equipment maintenance pro-
cedures for the charging system, starting system, engine safety controls, instrument
panel components, lighting system, gage sending units and warning switches, horn
assembly, battery system, chassis harnesses and miscellaneous items for which there
are authorized corrective maintenance tasks at the organizational maintenance levels.
7-2. EQUIPMENT ITEMS NOT COVERED. All equipment items for which corrective
mainteniince is authorized at the organizational maintenance levels are covered in
this chapter.
Section II. CHARGING SYSTEM
7-3. ENGINE GENERATOR REMOVAL AND REPLACEMENT
TOOLS:  Flat-tip screwdriver
Spanner wrench, pn CT685
9/16-inch socket wrench
9/16-inch open end wrench (2)
Pliers
Mechanical puller
3/4-inch socket wrench
Torque wrench, 150 pound-feet capacity
Feeler gage, 0.005 inch
Strap wrench
3/8-inch open end wrench
Tape
SUPPLIES:
Shim set
Solvent, dry cleaning, type II (SD-2), Fed. Spec P-D-680
Jumper wires (2)
PERSONNEL: One
EQUIPMENT CONDITION: Truck parked, engine off, handbrake set.
a. Preliminary Procedure.
(1) Disconnect battery ground cable. Refer to para 7-44.
(2) Open hood. Refer to TM 9-2320-211-10.
7-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business