Click here to make tpub.com your Home Page

Page Title: Section II. SERVICE UPON RECEIPT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1730-223-13
Section II. SERVICE UPON RECEIPT
3-4. UNPACKING OF EQUIPMENT.
a. Remove all restraining straps.
b. Use lifting rings on frame to lower platform to ground.
c. Unstrap hand rails.
d. Refer to tale 3-2 and perform actions listed.
Service U pon Receipt
Table 3-2.
REMARKS
ITEM
ACTION
LOCATION
Inspect for
Components
Container
damage
Compare list
List,
Packing Slip,
to what was
parts
contents of
shipped
container
shipped
Check for
All parts
Contents of
modified
container
parts
3-5. CHECKING UNPACKED EQUIPMENT.
a. Inspect the equipment for damage incurred during shipment.
If the equipment has been damaged, report the damage on DD Form 6,
Packaging Improvement Report.
b. Check the equipment against the packing slip to see if the
shipment is complete. Report all discrepancies in accordance with
instructions in DA PAM 738-751.
c. Check to see whether the equipment has been modified.
3-6. ASSEMBLY OF EQUIPMENT.
a. Place handrails in sockets and secure with setscrews.
b. Install air hose inside right handrail with fishtape in
accordance with paragraph 3-27.
c. Install electrical wires inside left handrail in accordance
d. Install outlet boxes to ends of wires and make wire
connections as shown in figure 3-1.
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business