TM 55-1730-223-13
Section II. SERVICE UPON RECEIPT
a. Remove all restraining straps.
b. Use lifting rings on frame to lower platform to ground.
c. Unstrap hand rails.
d. Refer to tale 3-2 and perform actions listed.
Service U pon Receipt
Table 3-2.
REMARKS
ITEM
ACTION
LOCATION
Inspect for
Components
Container
damage
Compare list
List,
Packing Slip,
to what was
parts
contents of
shipped
container
shipped
Check for
All parts
Contents of
modified
container
parts
a. Inspect the equipment for damage incurred during shipment.
If the equipment has been damaged, report the damage on DD Form 6,
Packaging Improvement Report.
b. Check the equipment against the packing slip to see if the
shipment is complete. Report all discrepancies in accordance with
instructions in DA PAM 738-751.
c. Check to see whether the equipment has been modified.
a. Place handrails in sockets and secure with setscrews.
b. Install air hose inside right handrail with fishtape in
accordance with paragraph 3-27.
c. Install electrical wires inside left handrail in accordance
with paragraph 3-27.
d. Install outlet boxes to ends of wires and make wire
connections as shown in figure 3-1.