|
|
TM55-1730-215-13 & P
Position lower mount on
h.
cyclinder (15) to mounting
bracket on outside scissor (16).
Install bolt through mounts. Do
not tighten. Swing cylinder (15)
into position and attach
cyclinder ram to inside scissor
(27). Install second bolt.
Tighten both bolts.
i. Slide upper ladder (3) down
through ladder guides on lower
ladder (6) and attach upper
ladder to platform floor plate
(14).
j. Install pump handle (9) on
pump assembly (8).
k. Slide side rails (1) and end
rail (2) into guides on platform
floor plate (14).
Inspect the assembled maintenance
platform for the following:
a. General alignment and
securing all components and
attaching hardware.
b. Hydraulic
line and fittings
secure and free of leaks.
c. Roller channels and ladder
guides free of any foreign
material.
The hydraulic system is filled
with hydraulic equipment
preservative oil for shipment.
Drain preservative oil and refill
to within 1/2 inch of top of
reservoir with hydraulic fluid,
(item 3, Appendix D) before
operating maintenance platform.
Drain preservative oil as
follows:
a. Place suitable container,
one quart or larger, under
cylinder assembly.
b. Disconnect hydraulic hose
(7) at lower end of cylinder
assembly (15).
3-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |