|
|
TM 5-5420-279-23
b.
Install
(1)
Fit the load holding valve (7) to the jib cylinder (1) with the four mounting bolts (2).
(2)
Fit the hydraulic pipes (3,4,5 and 6).
c.
Follow on tasks
(1)
Check the operation of the crane in accordance with the operator's manual TM 5-5420-
279-10.
(2)
Check for hydraulic leaks.
6-234
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |