Click here to make tpub.com your Home Page

Page Title: Remove
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
1
2
3
7
4
6
5
a.
Remove
(1)
Locate and identify which load holding valve is to be replaced. Item (7) is the load holding
valve for the jib cylinder (1) retract.
(2)
Ensure that the crane is in the folded position.
(3)
De-pressurise the hydraulic system. See unit maintenance procedure 5-118.
(4)
Disconnect hydraulic pipes (3, 4 5 and 6).
(5)
Remove the four mounting bolts (2) securing the load holding valve to the jib cylinder (1).
(6)
Remove the load holding valve (7).
(7)
Check all threaded components for wear or damage.
(8)
Replace components as necessary.
6-233

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business