|
|
TM 5-5420-279-23
This task covers:
a. Align
INITIAL SETUP:
Tools Required
None
Materials Required
None
Equipment Conditions
None
NOTE
The following procedure can be used for positioning the crane in a preferred position for
carrying out maintenance on the rotate coupling, lifting cylinder, jib cylinder and extension
cylinders.
a.
Align
(1)
Position a flat platform vehicle alongside the right hand side of the DSB.
(2)
Unfold the DSB crane and rest the jib extensions on a suitable surface in the position
shown in the following drawing.
(3)
Follow the relevant maintenance procedure for the assembly under repair.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |