|
|
TM 5-5420-279-23
b.
Install
(1)
Fit the rod attaching the connecting link (3) to the boom or jib extension housing.
(2)
Apply thread locking compound to all set screws.
(3)
Fit the stop mechanical and set screws to the rod attaching the connecting link (3) to the
boom or boom jib.
(4)
Fit connecting links (1 and 2).
(5)
Fit rods (5 and 9).
(6)
Fit ring retaining (6 and 10).
(7)
Fit the stop mechanical (7 and 11) as noted during removal.
(8)
Fit the set screws (8 and 12).
(9)
Apply grease to the lever remote control through the grease fittings (4).
c.
Follow on task
(1)
Check the operation of the crane.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |