|
|
TM 5-5420-279-23
This task covers:
a. Remove
b. Install
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Materials Required
None
Equipment Conditions
Vehicle switched off and battery shutoff switch in the off position
Crane stowed
2
3
4
1
a.
Remove
(1)
Remove the quick release military plug connection (1).
(2)
Remove the four screws (2) securing the electrical junction box cover (3).
(3)
Using the wiring diagram provided at appendix J, note the positions of the wiring at the
termination block.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |