Click here to make tpub.com your Home Page

Page Title: CRANE - BOOM CRANE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
CRANE - BOOM CRANE
This task covers:
a. Remove
b. Install
INITIAL SETUP:
Tools Required
Personnel Required
Tool Kit, General Mechanic's,
Two
Automotive (GMTK)
Equipment Conditions
Materials Required
None
Thread locking compound, loctite 243
WARNING
SLIP AND FALL INJURY. PERSONNEL MAY SLIP ON SPILLED HYDRAULIC
FLUID. SUITABLE CONTAINERS AND FLUID ABSORBENT MATERIALS ARE TO
BE USED TO CONTAIN SPILLAGE.
a.
Remove
(1)
Remove the jib cylinder lever remote control assembly. See direct support maintenance
procedure 6-062.
(2)
Retain front bushes (7) and spacer (8).
(3)
Remove bolts (4), plate retaining (3) and spacer (2).
(4)
Remove shaft (1).
(5)
Remove the jib boom extension assembly. See direct support maintenance procedure
6-062.
(6)
Remove the set screws (12) and stops mechanical (11).
(7)
Support the weight of the jib cylinder.
(8)
Remove rod (10).
(9)
Remove the jib cylinder. See direct support maintenance procedure 6-051.
(10)
Remove rod (9).
NOTE
The lift cylinder lever remote control is attached to the boom by rod (9)
(11)
Remove the lift cylinder lever remote control assembly. See direct support maintenance
procedure 6-063.
(12)
Release the hydraulic lines (18 through 22) and electrical cables from the boom by
removing bolts (15, 17 and 25).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business