Click here to make tpub.com your Home Page

Page Title: FAR AND HOME BANK CARRIAGE - FAR BANK LOWER PULLEYS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
FAR AND HOME BANK CARRIAGE - FAR BANK LOWER PULLEYS
This task covers:
a. Remove
b. Install
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Materials Required
Grease (As required)
Thread locking compound, loctite 243
Multi-Gasket loctite 574
Lock washers (Qty 2)
Personnel Required
Two
Equipment Conditions
A-Frame deployed.
WARNING
CRUSH INJURY. THE FAR BANK CARRIAGE LOWER PULLEY BLOCK IS HEAVY.
DANGER TO PERSONNEL. SHARP METAL SURFACES. THE ROPE PULLEYS
MAY HAVE SHARP METAL SURFACES. PERSONNEL ARE TO WEAR PERSONAL
PROTECTIVE EQUIPMENT (GLOVES) WHEN HANDLING ROPES AND ROPE
PULLEYS.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business