|
|
TM 5-5420-279-23
2
1
3
a.
Remove
(1)
De-pressurize the hydraulic system. Refer to unit maintenance procedure 5-118.
(2)
Remove the left-hand launch frame guard to gain access to the articulator manifold
assembly.
(3)
Note the position of and disconnect the hydraulic pipe work connected to the articulator
manifold assembly (1).
(4)
Note the position of and remove the electrical connections (2) on the articulator manifold
solenoid valves.
(5)
Support the weight of the articulator manifold assembly (1).
(6)
Remove the four mounting bolts, nuts and washers (3) securing the articulator manifold
assembly to the launch frame.
(7)
Remove the articulator manifold assembly (1).
(8)
Note the position of and remove all hydraulic valves, valve blocks, test points, blanking
plugs and blanking flanges.
(9)
Fit the hydraulic valves, valve blocks, test points, blanking plugs and blanking flanges to
the new manifold assembly using new gaskets and o-rings where applicable.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |