Click here to make tpub.com your Home Page

Page Title: Follow on tasks
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
(8)
Fit the top layer of the energy chain (12). See unit maintenance procedure 5-097.
(9)
Fit the fixed walkway (3, 4 and 5) to the rear of the sliding frame, adjacent to the A-Frame.
(10)
Fit the stabilizer feet to the A-Frame stabilizer legs. See unit maintenance procedure 5-021.
(11)
Fit the access ladders (2, 6 and 8) to the A-Frame.
(12)
Fit the launch frame see direct support maintenance procedure 6-018.
c.
Follow on tasks
(1)
Switch the battery shutoff switch to the on position.
(2)
Carry out a full operation check of the of the A-Frame assembly in accordance with the
operator's manual TM 5-5420-279-10.
(3)
Check for hydraulic oil leaks.
6-24

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business