TM 5-5420-279-23
(8)
Fit the top layer of the energy chain (12). See unit maintenance procedure 5-097.
(9)
Fit the fixed walkway (3, 4 and 5) to the rear of the sliding frame, adjacent to the A-Frame.
(10)
Fit the stabilizer feet to the A-Frame stabilizer legs. See unit maintenance procedure 5-021.
(11)
Fit the access ladders (2, 6 and 8) to the A-Frame.
(12)
Fit the launch frame see direct support maintenance procedure 6-018.
c.
Follow on tasks
(1)
Switch the battery shutoff switch to the on position.
(2)
Carry out a full operation check of the of the A-Frame assembly in accordance with the
operator's manual TM 5-5420-279-10.
(3)
Check for hydraulic oil leaks.
6-24
|