|
|
TM 5-5420-279-23
This task covers:
a. Remove
b. Install
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Materials Required
Thread locking compound, loctite 243
Personnel Required
Four
Equipment Conditions
A-Frame removed from launch vehicle and placed on a suitable working
surface
WARNING
CRUSH INJURY. TO AVOID INJURY TO PERSONNEL WHEN WORKING ON THE
UPPER CENTER BEAM ALWAYS ENSURE THAT THE WEIGHT OF THE UPPER
CENTER BEAM IS SUPPORTED.
SLIP AND FALL INJURY. PERSONNEL MAY SLIP ON SPILLED HYDRAULIC
FLUID. SUITABLE CONTAINERS AND FLUID ABSORBENT MATERIALS ARE TO
BE USED TO CONTAIN SPILLAGE.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |