|
|
TM 5-5420-279-23
This task covers:
a. Remove
b. Install
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Brass bar, Rubber hammer (Common No 1)
Materials Required
Antiseize compound
Nyloc nut (Qty 1)
Roller assembly (Qty 1)
Equipment Conditions
A-Frame Unfolded
1
NOTE
There are four upper and lower side rollers fitted to the Far Bank Carriage.
There are four lower side rollers fitted to the Home Bank Carriage
The procedure for changing the left and right hand roller assemblies is identical.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |