|
|
TM 5-5420-279-23
This task covers:
a. Remove
b. Inspect
c. Install
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Materials Required
Grease (As required)
Equipment Conditions
Top roller removed from Home or Far bank carriage
a.
Remove
(1)
Remove the top roller from the far or home bank carriage. See unit maintenance procedure
5-062.
(2)
Remove the retaining ring (1).
(3)
Remove the spacers (2 and 3) and washer (15).
(4)
Remove the roller (4) complete with bearings (13), seals (14), washer (15), spacer (5) and
retaining ring (6) from the shaft (11).
(5)
Remove the spacer sleeve (7).
(6)
Remove the roller rope guide (10) complete with bearings (8) and spacer tube (9) from the
shaft (11).
(7)
Carry out steps 2, 3, 4 and 6 to the opposite roller.
(8)
If required note the position of and remove retaining ring (6), spacer (5), bearings (13),
seals (14) and washer (12) from the roller (4).
b.
Inspect
(1)
Check all components for wear and damage.
(2)
Ensure that all grease ports are clean.
c.
Install
(1)
Refer to general unit maintenance procedure 5-158 to assemble the top roller bearings.
(2)
Fit sleeve tube (9) to the shaft (11).
(3)
Place shaft (11) inside rope roller guide (10).
(4)
Fit bearings (8) to each end of the rope roller guide (10).
(5)
Fit the spacer sleeves (7) to the shaft (11).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |