Click here to make tpub.com your Home Page

Page Title: FAR AND HOME BANK CARRIAGE - TOP ROLLER BEARINGS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
5 - 063 FAR AND HOME BANK CARRIAGE - TOP ROLLER BEARINGS
This task covers:
a. Remove
b. Inspect
c. Install
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Materials Required
Grease (As required)
Equipment Conditions
Top roller removed from Home or Far bank carriage
a.
Remove
(1)
Remove the top roller from the far or home bank carriage. See unit maintenance procedure
5-062.
(2)
Remove the retaining ring (1).
(3)
Remove the spacers (2 and 3) and washer (15).
(4)
Remove the roller (4) complete with bearings (13), seals (14), washer (15), spacer (5) and
retaining ring (6) from the shaft (11).
(5)
Remove the spacer sleeve (7).
(6)
Remove the roller rope guide (10) complete with bearings (8) and spacer tube (9) from the
shaft (11).
(7)
Carry out steps 2, 3, 4 and 6 to the opposite roller.
(8)
If required note the position of and remove retaining ring (6), spacer (5), bearings (13),
seals (14) and washer (12) from the roller (4).
b.
Inspect
(1)
Check all components for wear and damage.
(2)
Ensure that all grease ports are clean.
c.
Install
(1)
Refer to general unit maintenance procedure 5-158 to assemble the top roller bearings.
(2)
Fit sleeve tube (9) to the shaft (11).
(3)
Place shaft (11) inside rope roller guide (10).
(4)
Fit bearings (8) to each end of the rope roller guide (10).
(5)
Fit the spacer sleeves (7) to the shaft (11).

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business