Click here to make tpub.com your Home Page

Page Title: Follow on task
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
(3)
Position rope guide plates (6, 10) on pulley (5).
(4)
Place and align pulley (5) with guide rope plates (6, 10) into forward launch beam (11).
(5)
Insert pulley pin (15) through forward launch beam (11), guide rope plates (6, 10) and
pulley (5).
(6)
Apply thread-locking compound to screws (4) and secure pulley pin (15) with washers (3)
and screws (4).
(7)
Ensure that the winch rope is located on the pulley (5).
(8)
Locate spacer bar (7) between rope guide plates (6, 10) and over the winch rope (18).
(9)
Apply thread-locking compound to screws (9) and secure spacer bar (7) with washers (8)
and screws (9).
(10)
Insert rope guide pin (13) through forward launch beam (11) and rope guide plates (6, 10)
and over the winch rope (18).
(11)
Fit spring pins (12) to rope guide pin (13).
(12)
Grease the bearing through the grease fitting (14) until grease seeps past the sealing caps
(1, 17). Rotate the pulley (5) to ensure even distribution of grease in the bearing (16).
(13)
Connect the winch rope (18) to the termination point on the far bank carriage.
c.
Follow on task
(1)
Check the operation of the upper winch, forward launch beam, and far bank carriage
ensuring that the pulley (5) and winch rope run freely.
5-210

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business