|
|
TM 5-5420-279-23
(3)
Position rope guide plates (6, 10) on pulley (5).
(4)
Place and align pulley (5) with guide rope plates (6, 10) into forward launch beam (11).
(5)
Insert pulley pin (15) through forward launch beam (11), guide rope plates (6, 10) and
pulley (5).
(6)
Apply thread-locking compound to screws (4) and secure pulley pin (15) with washers (3)
and screws (4).
(7)
Ensure that the winch rope is located on the pulley (5).
(8)
Locate spacer bar (7) between rope guide plates (6, 10) and over the winch rope (18).
(9)
Apply thread-locking compound to screws (9) and secure spacer bar (7) with washers (8)
and screws (9).
(10)
Insert rope guide pin (13) through forward launch beam (11) and rope guide plates (6, 10)
and over the winch rope (18).
(11)
Fit spring pins (12) to rope guide pin (13).
(12)
Grease the bearing through the grease fitting (14) until grease seeps past the sealing caps
(1, 17). Rotate the pulley (5) to ensure even distribution of grease in the bearing (16).
(13)
Connect the winch rope (18) to the termination point on the far bank carriage.
c.
Follow on task
(1)
Check the operation of the upper winch, forward launch beam, and far bank carriage
ensuring that the pulley (5) and winch rope run freely.
5-210
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |