|
|
TM 5-5420-279-23
This task covers:
a. Remove
b. Install
INITIAL SETUP:
Tools Required
Personnel Required
Tool Kit, General Mechanic's,
Two
Automotive (GMTK)
Equipment Conditions
Materials Required
A-Frame deployed
Thread locking compound, loctite 243
Lock washers (Qty 4)
2
3
4
1
a.
Remove
(1)
Remove the launch beam pins (1) from the launch beam pin storage rack (2).
NOTE
An empty launch beam pin storage rack (2) can be lifted by one person.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |