|
|
TM 5-5420-279-23
a.
Remove
3
(1)
The stowing cylinders (1) are located
on the side of the launch frame and are
connected to the articulator cylinder
(2).
(2)
Remove the launch frame guards as
required. Refer to operator's
TM 5-5420-279-10 Chapter 10.
1
(3)
De-pressurize hydraulic system. Refer
to unit maintenance procedure 5-118.
(4)
If required de-pressurize stow cylinder
refer to unit maintenance procedure
2
5-123.
(5)
Note the position of and remove the
three hydraulic hoses (3) connected to
the stow cylinder (1).
5
(6)
Remove the bolts (4) securing the
cylinder locking plate (5)
(7)
Remove the stow cylinder pivot pin (6)
and retain the two spacers.
(8)
Support the weight of the stow cylinder
(1).
6
(9)
Remove the snap ring (7) from the
stow cylinder pivot pin (8) on the
4
launch frame mounting.
(10)
Remove the stow cylinder pivot pin (8)
and retain the two spacers.
(11)
Remove the stow cylinder (1).
(12)
Inspect components for damage and
corrosion.
(13)
Examine bolt heads and threads for
damage.
(14)
Replace components as required.
8
b.
Install
7
(1)
Position and support the weight of the
stow cylinder (1) on the launch frame
mounting.
(2)
Partially insert the pivot pin (8) through the stow cylinder and fit the spacers.
(3)
Insert the pivot pin (8) and secure in place with the snap ring (7).
(4)
Position and support the weight of the stow cylinder (1) on the articulator cylinder
mounting.
(5)
Partially insert the pivot pin (6) through the stow cylinder (1) and fit the spacers.
NOTE
Locking plate and screws should be fitted towards the centerline of the frame assembly
rather than towards the outside.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |