|
|
TM 5-5420-279-23
This task covers:
a. Remove
b. Install
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Puller (Shop Set Contact Maintenance Truck HMMWV)
Materials Required
Thread locking compound, loctite 243
Loctite adhesive 641
Equipment Conditions
A-Frame deployed
Remove the launch beam drive motor, see maintenance procedure 5-034 and
place on a suitable working surface
WARNING
DANGER TO PERSONNEL FROM MOVING PARTS. ENSURE THAT THE
LAUNCHER IS NOT OPERATED DURING THIS PROCEDURE.
a.
Remove
(1)
Remove two socket head screws (1) from sprocket (2).
(2)
Using a puller remove sprocket (2).
(3)
If required remove key (3) from shaft.
(4)
Inspect components for damage and corrosion.
(5)
Examine socket head screws for damage to bolt heads and threads.
(6)
Replace components as required.
b.
Install
(1)
Fit key (3) into shaft using key way retaining adhesive, (Loctite 641 or equivalent).
(2)
Fit sprocket (2) to shaft.
(3)
Apply thread locking compound to the socket head screws (1).
(4)
Secure sprocket (2) with socket head screws (1).
Change 1 5-159
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |