|
|
TM 5-5420-279-23
This task covers:
a. Remove
b. Install
INITIAL SETUP:
Tools Required
Tool Kit, General Mechanic's, Automotive (GMTK)
Materials Required
Thread locking compound, loctite 243
Bridge bearing pad
Equipment Conditions
A-Frame deployed
NOTE
The Bridge Bearing Pad (1) is fitted to the Bridge Emergency Stop bracket (3). There is a
Bridge Bearing Pad fitted to each of the A-Frame Stabilizer Leg assemblies (2).
Change 1 5-99
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |