|
|
TM 5-5420-279-23
This task covers:
a. Remove
b. Install
INITIAL SETUP:
Tools Required
Key set, socket head (metric) - GMTK
Materials Required
Thread locking compound, loctite 243
Equipment Conditions
Bridge Ramp Module open and on flat surface
NOTE
This procedure is only applicable to the Ramp Module.
Change 1 5-59
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |