Click here to make tpub.com your Home Page

Page Title: TSUM - 3-018 Carriage Drive Failure (High Bank Drive In) Part 1
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
TSUM - 3-018 Carriage Drive Failure (High Bank Drive In) Part 1
Carriage will not drive in
(High Bank)
W ARNING
For the Carriage to drive in (High Bank) the following
prerequisite conditions m ust be m et:
CRUSH INJURY. BEFORE CARRYING OUT
* Neutral gear selected
TROUBLESHOOTING INVOLVING SV10, A
* Parking brake applied
SUSPENDED OR PART BUILT BRIDGE M UST
* Tail Lift Pendant connected & powered
BE M ADE SAFE EITHER BY COM PLETING THE
* Chest Pack connected & powered
BUILD OPERATIONS IN BACK-UP MODE OR
* 4 Position Switch at position 4
BY RETRIEVING THE BRIDGE.
* Ensure E-STOP RESET satisfactory
* A-Fram e unfolded
CRUSH INJURY. A SUSPENDED BRIDGE W ILL
* A-Fram e rotated
M OVE IF SV10 IS MANUALLY OPERATED AND
* Slide Fram e extended
THE CHEST PACK RIGHT-HAND JOYSTICK IS
* Relax Pins withdrawn & Lim it Switches closed
M OVED FROM THE CENTRAL POSITION
* Chest Pack in Carriage Drive High Bank mode
CAUSING ACTIVATION OF OTHER SOLENOID
* RH Joystick moved backward from centre
VALVES.
Are the
Power down &
Perform
following Mimic
replace defective
lam p test on
Panel captions lit?-PV1b,
Mimic Panel.
No
No
Mim ic Panel.
SV5, SV6, SV8, SV10 (see
To replace Electrical
Are all lam ps
W ARNING), SV13b,
Enclosure see
lit?
SV14b &
m aintenance
SV15b
procedure 5-049
Yes
Yes
Are
the following
Disconnect connectors
Insert probes of DMM
solenoid connector LEDs
No
from listed solenoids.
into sockets 1 & 2 of
lit?- SV5, SV6, SV8, SV10
See maint procedure
each connector
(see W ARNING), SV13b,
5-141
SV14b &
NOTE
SV15b
Solenoids SV5, SV6, SV8 &
SV10 are located on the
Yes
Launch Frame Pilot
Manifold. Solenoids SV13b,
SV14b & SV15b are located
Disconnect solenoid
on the Launch Frame W inch
Replace solenoid
connectors from above listed
Control Manifold
Is 24V
harness if connector
solenoids. See m aint
Yes
solenoid supply
LED not lit. See
procedure 5-141. Connect
present?
m aintenance
DMM across solenoid coil
procedure 5-139
pins. See resistance check in
m aint procedure 5-124
No
Replace faulty harness
Power down & check
or Launch Frame Enclosure as
harness continuity from
appropriate using the following
listed solenoids to
Go to
maintenance procedures:-
Launch Frame
Part 2
Harness 5-139
Enclosure using the
Launch Fram e Enclosure
cable routing tables in
5-049
section 3.6 of Chapter 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business