Click here to make tpub.com your Home Page

Page Title: TSUM - 3-017 Carriage Drive Failure (Level Bank Drive In) Part 1
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
TSUM - 3-017 Carriage Drive Failure (Level Bank Drive In) Part 1
Carriage will not drive in
(Level Bank)
W ARNING
For the Carriage to drive in (Level Bank) the following
prerequisite conditions m ust be m et:
CRUSH INJURY. BEFORE CARRYING OUT
* Neutral gear selected
TROUBLESHOOTING INVOLVING SV10, A
* Parking brake applied
SUSPENDED OR PART BUILT BRIDGE M UST
* Tail Lift Pendant connected & powered
BE M ADE SAFE EITHER BY COM PLETING THE
* Chest Pack connected & powered
BUILD OPERATIONS IN BACK-UP M ODE OR
* 4 Position Switch at position 4
BY RETRIEVING THE BRIDGE.
* Ensure E-STOP RESET satisfactory
* A-Fram e unfolded
CRUSH INJURY. A SUSPENDED BRIDGE W ILL
* A-Fram e rotated
M OVE IF SV10 IS M ANUALLY OPERATED AND
* Slide Fram e extended
THE CHEST PACK RIGHT-HAND JOYSTICK IS
* Relax Pins withdrawn & Lim it Switches closed
M OVED FROM THE CENTRAL POSITION
* Chest Pack in Carriage Drive Level Bank m ode
CAUSING ACTIVATION OF OTHER SOLENOID
* RH Joystick m oved backward from centre
VALVES.
Power down &
Are the
Perform
replace defective
following Mim ic
lam p test on
Mim ic Panel.
No
No
Panel captions lit?-PV1a,
Mim ic Panel.
To replace Electrical
SV5, SV6, SV7, SV10 (see
Are all lam ps
Enclosure see
W ARNING), SV13a &
lit?
m aintenance
SV14a
procedure 5-049
Yes
Yes
Are the
Disconnect
following solenoid
Insert probes of DMM
connectors from
No
connector LEDs lit?- SV5,
into sockets 1 & 2 of
listed solenoids.
SV6, SV7, SV10 (see
each connector
See m aint procedure
W ARNING), SV13a
5-141
NOTE
& SV14a
Solenoids SV5, SV6, SV7 &
SV10 are located on the
Launch Fram e Pilot
Yes
Manifold. Solenoids SV13a,
SV14a are located on the
Launch Fram e W inch
Disconnect solenoid
Control Manifold
Replace solenoid
connectors from above listed
Is 24V
harness if connector
solenoids. See m aint
Yes
solenoid supply
LED not lit. See
procedure 5-141. Connect
m aintenance
present?
DMM across solenoid coil
procedure 5-139
pins. See resistance check in
m aint procedure 5-124
No
Replace faulty harness
Power down & check
or Launch Fram e Enclosure as
harness continuity from
appropriate using the following
listed solenoids to
Go to
m aintenance procedures:-
Launch Fram e
Part 2
Harness 5-139
Enclosure using the
Launch Fram e Enclosure
cable routing tables in
5-049
section 3.6 of Chapter 3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business