Page Title: TSUM - 3-015 Carriage Empty Drive Failure (Drive Out) Part 1
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
TSUM - 3-015 Carriage Empty Drive Failure (Drive Out) Part 1
Empty Far Bank Carriage will
not drive out
W ARNING
For the Empty Far Bank Carriage to drive out the
following prerequisite conditions must be met:
CRUSH INJURY. BEFORE CARRYING OUT
*
Neutral gear selected
TROUBLESHOOTING INVOLVING SV10, A
*
Parking brake applied
SUSPENDED OR PART BUILT BRIDGE M UST
*
Tail Lift Pendant connected & powered
BE MADE SAFE EITHER BY COMPLETING THE
*
Chest Pack connected & powered
BUILD OPERATIONS IN BACK-UP M ODE OR
*
4 Position Switch at position 4
BY RETRIEVING THE BRIDGE.
*
Ensure E-STOP RESET satisfactory
*
A-Frame unfolded
CRUSH INJURY. A SUSPENDED BRIDGE W ILL
*
A-Frame rotated
MOVE IF SV10 IS M ANUALLY OPERATED AND
*
Slide Frame extended
THE CHEST PACK RIGHT-HAND JOYSTICK IS
*
Relax Pins withdrawn & Limit Switches closed
M OVED FROM THE CENTRAL POSITION
*
Chest Pack in Carriage Drive Carriage Empty m ode
CAUSING ACTIVATION OF OTHER SOLENOID
*
RH Joystick moved forward from centre
VALVES.
Are the
Power down & replace
Perform
following Mimic
defective Mim ic Panel.
lamp test on
Panel captions lit? - PV1a,
No
No
To replace Electrical
Mimic Panel.
SV5, SV6, SV7,SV8, SV10
Enclosure see
Are all lamps
(see W ARNING),
maintenance
lit?
SV13b, SV14b &
procedure 5-049
SV15a
Yes
Yes
Are the
following solenoid
Disconnect connectors
connector LEDs lit?-
Insert probes of DMM
No
from listed solenoids.
SV5, SV6, SV7, SV8, SV10
into sockets 1 & 2 of
See m aint procedure
(see W ARNING),
each connector
5-141
SV13b, SV14b &
NOTE
SV15a
Solenoids SV5, SV6, SV7,
SV8 & SV10 are located on
the Launch Frame Pilot
Yes
Manifold. Solenoids SV13b,
SV14b & SV15a are located
on the Launch Frame W inch
Disconnect solenoid
Control Manifold
Replace solenoid
connectors from above
harness if connector
listed solenoids. See maint
Is 24V
Yes
LED not lit. See
procedure 5-141. Connect
solenoid supply
maintenance
DMM across solenoid coil
present?
procedure 5-139
pins.See resistance check
in maint procedure 5-124
No
Replace faulty harness
Power down & check
or Launch Fram e Enclosure as
harness continuity from
appropriate using the following
listed solenoids to
Go to
m aintenance procedures:-
Launch Fram e
Part 2
Harness 5-139
Enclosure using the
Launch Frame Enclosure
cable routing tables in
5-049
section 3.6 of Chapter 3