TM 5-5420-279-23
TSUM - 2-027 Uneven A-Frame Fold (Park) (122)
A-Fram e folds in
erratic or uncontrolled
m anner
Does one
side of A-Fram e not
begin to
fold
No
Yes
Are locking pins
Rem ove locking
No
rem oved from
pins
affected side?
Operator
Tasks
Yes
Maintainer
Tasks
Replace affected
Connect a pressure gauge to both
cylinder. See
TPB2 and TPB3 at the Stabilizer
m aintenance procedure
Manifold
5-014
Operate Park button on Operator's
Panel
Does
pressure on
Replace affected cylinder
affected side increase to
Yes
assem bly. See m aintenance
1160 psi (8000 kPa )
procedure 5-014
TPB2 = LH
TPB3 = RH
No
Does
Replace Valve Stack
Replace
pressure
at SV20 on Stabilizer
synchronising flow
on un-affected side rise
Manifold. See fault finding
Yes
No
divider. See
to 900 psi (6000 kPa) &
procedure 2-031 and
m aintenance
cylinder operate
m aintenance procedure
procedure 5-126
correctly
5-120
|