|
|
TM 5-5420-279-23
TSUM - 2-026 A-Frame Rotate (Park) (119) Part 2
Part 2
All Maintainer Tasks
Is
LED on
Check that LED
Carry out electrical
SV19a on A-Fram e Rotate
on SV16 on Pilot
trouble shooting. See
Manifold illum inated
Manifold assy is
Yes
electrical trouble
No
when A-Fram e Rotate Park
illum inated when
shooting chapter 3
Button pressed
Rotate Deploy
procedure 3-020
on Operator
Button is pressed
Panel
Operate SV19a on
Replace solenoid
the A-Fram e
Does A-Fram e
SV19a. See
Rotate Manifold
rotate when SV19a is
Yes
m aintenance
m anually
m anually
procedure 5-124
NOTE CAUTION
operated
No
Fit a pressure
gauge to TPB1 on
CAUTION
A-Fram e Rotate
Ensure A-Fram e Rotate Deploy
Manifold
button is held depressed or
m anual operation of SV16 is
carried out while SV19a is
operated. Dam age to Stow
cylinders or Articulator cylinders
Manually operate
m ay arise if this is not carried
SV19a
out.
NOTE CAUTION
Go to
Part 3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |