Click here to make tpub.com your Home Page

Page Title: TSUM - 2-020 Bridge Return Level Bank Part 1
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
TSUM - 2-020 Bridge Return Level Bank Part 1
Bridge will not
return
CAUTION
W hen checking function of
winches by paying out rope allow
ONLY SUFFICIENT SLACK to
Ensure bridge in
dem onstrate correct functioning.
Level Bank m ode
DO NOT ALLOW SLACK rope to
on chest pack
becom e caught on other parts of
the equipm ent or becom e
incorrectly positioned on sheave
blocks etc.
Nothing drives
Operator
Maintainer
when joystick
Tasks
Tasks
operated
Confirm correct function
of Upper W inch as
follows:- Step to Top
Does
Go to Top
W inch on chest pack.
Upper W inch
W inch Check.
Operate joystick to pay
operate under
No
See hydraulic trouble
out rope.
proportional
shooting chapter 2
NOTE CAUTION
control
procedure 2-029
Operate joystick to take
up slack rope.
Yes
Confirm correct function
of Lower W inch as
follows:-
Step to Bridge Lift on
chest pack. Operate
joystick to pay out rope.
NOTE CAUTION
Operate joystick to Bridge
Raise to take up slack
rope.
Does
Go to
Lower W inch
Lower W inch Check.
operate under
No
See hydraulic trouble
proportional
shooting chapter 2
control
procedure 2-028
Yes
Go to
Part 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business