|
|
TM 1-1510-223-MTF
PROCEDURE
TROUBLESHOOTING
REFERENCE
SECOND ENGINE START (BATTERY START) (CONT)
NOTE
When voltage drops below approximately 20 volts, the beacon
light may become inoperative. To reset beacon light, turn off
for approximately 5 seconds, then DAY or NIGHT.
14. BEACON lights switch - Reset, then on.
ABORT START PROCEDURE
1.
CONDITION lever - FUEL CUTOFF.
2.
ENG START switch - STARTER ONLY.
3.
TGT - Monitor for drop in temperature.
4.
ENG START switch - OFF.
ENGINE CLEARING PROCEDURE
1.
CONDITION lever - FUEL CUTOFF.
2.
ENG START switch - OFF (1 minute minimum).
3.
ENG START switch - STARTER ONLY.
4.
ENG START switch - OFF.
FIRST ENGINE START (GPU START)
When making a ground power unit (GPU) start, start the left engine
first due to the GPU receptacle being adjacent to the right engine.
Normally, only one engine is started utilizing the GPU, reverting to the
battery start procedure for the second engine start. Assign a crew
member to monitor the fire guard throughout the engine start
procedures.
1.
INS - As required.
2-36
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |