Click here to make tpub.com your Home Page

Page Title: ABORT START PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 1-1510-223-MTF
PROCEDURE
TROUBLESHOOTING
REFERENCE
SECOND ENGINE START (BATTERY START) (CONT)
NOTE
When voltage drops below approximately 20 volts, the beacon
light may become inoperative. To reset beacon light, turn off
for approximately 5 seconds, then DAY or NIGHT.
14. BEACON lights switch - Reset, then on.
ABORT START PROCEDURE
1.
CONDITION lever - FUEL CUTOFF.
2.
ENG START switch - STARTER ONLY.
3.
TGT - Monitor for drop in temperature.
4.
ENG START switch - OFF.
ENGINE CLEARING PROCEDURE
1.
CONDITION lever - FUEL CUTOFF.
2.
ENG START switch - OFF (1 minute minimum).
3.
ENG START switch - STARTER ONLY.
4.
ENG START switch - OFF.
FIRST ENGINE START (GPU START)
When making a ground power unit (GPU) start, start the left engine
first due to the GPU receptacle being adjacent to the right engine.
Normally, only one engine is started utilizing the GPU, reverting to the
battery start procedure for the second engine start.  Assign a crew
member to monitor the fire guard throughout the engine start
procedures.
1.
INS - As required.
2-36

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business