Click here to make tpub.com your Home Page

Page Title: TURNTABLE BEARING INSPECTION PROCEDURES FOR GROVE M977, GROVE M984, AND GROVE M985 CRANES.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 9-2320-279-34
2-8. TURNTABLE BEARING INSPECTION PROCEDURES FOR GROVE M977, GROVE M984, AND
GROVE M985 CRANES.
Initial Setup.
NOTE
Ensure that the turntable bearing is lubricated and that all the turntable mounting
bolts have been tightened to the recommended torque.
Operate the crane controls smoothly to avoid any jerking or harsh movement that
could affect the dial indicator reading.
Perform steps a. through c. for GROVE M984 cranes.
Perform steps b. and d. for GROVE M977 and M985 cranes.
a.
Lower fairlead into operating position (Refer to TM 9-2320-279-10).
b.
Place crane in operating position and level side to side with outriggers
(Refer to TM 9-2320-279-10).
c.
Keeping boom level, lower mast until approximately one inch (24.4 mm) clearance is present
between the erection cylinder and the crane outrigger cover. Rotate the crane in both directions
to ensure no contact will be made with the outrigger cover by either the cylinder or the tension
links. Adjust the clearance if contact might occur.
d.
Keeping boom level, lower mast until approximately one inch (24.4 mm) clearance is present
between the erection cylinders and the rear cargo body panel. Rotate the crane in both directions
to ensure no contact will be made with the rear cargo body panel by either cylinder. Adjust the
clearance if contact might occur.
Placement of Dial Indicator.
NOTE
To obtain a true reading of bearing vertical movement, the dial indicator and
magnetic base must be positioned correctly.
Perform step e. for placement of dial indicator for M977 and M985 trucks.
a.
Ensure that the plunger of the dial indicator is straight up and down in all directions, front to
back and side to side. It is not necessary to measure this, but try to get it as close as possible
with a visual inspection from different angles.
b.
Ensure that the dial indicator is pre-loaded at least one turn by allowing the needle to complete
one turn around the dial before zeroing the dial.
c.
Ensure that the magnetic base is secure at its attachment point so it will not move and
contribute to a false indicator reading.
d.
The dial indicator must be in line with the axial centerline of the boom for all measurements.
e.
Due to the position of the crane power/remote control junction box, it is not possible to position
the boom at exact 90 degree and 180 degree positions and have a mounting spot for the magnetic
base. Position the magnetic base first and then rotate the boom to place the boom axial
centerline over the magnetic base, then install the dial indicator.
f.
To ensure a consistent reading, the dial indicator plunger must be as close as possible to the
outside diameter of the swing gear tooth tip, as the allowable bearing movement only applies at
the tip of the gear tooth. The indicator reading will be magnified if the plunger contact point is
off of the outer diameter of the swing gear tooth tip.
g.
Always verify that the dial indicator reading is correct by lowering the boom from the 60 degree
boom angle to the level boom angle, then check that the dial indicator returns to the zero
position. Repeat the procedure if the dial indicator does not return to the zero position.