|
|
TB 750-25
The commander/chief of the activity scheduled to be inspected, or their next higher
headquarters should ensure:
a. Internal coordination is such that the USATA inspection team can accomplish
its mission in an efficient and effective manner within the allotted time.
b. Time is made available for entrance and exit interviews with the
commander/chief or a designated representative.
c. Requested documentation applicable to the activity's operations is made
available to the inspection team as follows:
(1) TMDE calibration and repair mission and function statements.
(2) Organizational charts of the calibration and repair activity and, as
applicable, the higher headquarters command channels.
(3) TDA, TOE, and MTOE as applicable.
(4) The authorized and assigned strength of the facility (officer, warrant
officer, enlisted, and civilian).
(5) Calibration
and
repair
scheduling
accomplishment,
recording,
and
reporting.
(6) Local QA records.
(7) A complete set of applicable local operating procedures.
(8) Documented significant problems pertaining to the calibration and/or
repair mission.
(9) Approved or pending requests for waiver.
(10) Shortages and requisitions of DA publications (calibration, maintenance,
and administrative).
d. Access to restricted areas when necessary.
e. A room with sufficient table or desk space for the inspection team to work and
discuss matters in private.
f.
Sufficient number of recently calibrated end items.
inspection of an item of TMDE/standard that has completed the calibration and/or repair
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |