Click here to make tpub.com your Home Page

Page Title: Table 1. Repair Instructions and Time Between Overhaul
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

a. Repair Sites.
mand for disposition instructions.
(1) Tooele Army Depot, Tooele, Utah, is the cen-
(2) Other authorized repair sites are direct and
tral overhaul facility for the components listed in para-
general support facilities which have the capability of
graphs 1a, b, c. and d. These items are the responsibility
repair by replacement.
of MECOM (Mobility Equipment Command) and re-
b Repair Instruction and Time Overhaul. Repair-
pair instructions for them are contained in TM 5-6115
434 series. Items listed in paragraphs la, b, c, and d
able items must be turned in for repair/overhaul when
are T-coded and managed by MECOM, and when they
they have been in operation for the total number of
require depot overhaul must be reported to that Com-
hours indicated in table 1 or upon failure or malfunction.
Table 1. Repair Instructions and Time Between Overhaul
Note 1  Return to depot every 22,000 hours of operation or three 7.500 hours engine changes
Note 2 Replace at 4,000 hours operation  Return to depot for overhaul Repair by replacement
Note 3 Return with engine to depot at 7,500 hours operating time Repalr by replacement
Note 4 Operate until failure or malfunction Repair by replacement
c. A requisition for a replacement engine assembly
are shipped, MECOM will be furnished the following
with dual pad drive assembly, FSN 2835-934-7910, will
information by message with an information to the re-
be submitted at 7,000 hours of operation.
ceiving depot:
(I ) FSN, nomenclature, make, model, and serial
5. Replacement Requisitions. a. Using units will sub-
number.
mit replacement requisitions to their supply activity
when components reach the hours of operation since
new or last overhaul as shown in Table
These requi-
(3) Mode of tran
sitions will indicate the FSN, make, model, serial num-
ber, and hours of operation of the component being
replaced. If acknowledgement of requisition is not re-
ceived when component reaches the total hours indicated
in Table 1, MECOM will be advised immediately by
electrically transmitted message addressed to Command-
ing General, U.S. Army Mobility Equipment Command,
ATTN: AMSME-SC, 4300 Goodfellow Blvd., St. Louis,
MO. 63120. A separate requisition
each replacement component request
visions of this bulletin. All items
uneconomically repairable or in doubtful
dit
reported
in
with AR

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business