Click here to make tpub.com your Home Page

Page Title: PROCEDURES/INSTRUCTIONS FOR ASSEMBLIES/COMPONENTS/PARTS IN WORK OR IN STOCK (AT ALL LEVELS INCLUDING WAR RESERVES)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 1-1520-240-20-163
c.
If any UBA port size/wrench size is not as specified above, complete the following for each suspect UBA.
(1)  Make the following entry on the DA Form 2408-13-1. Enter a red //X// status symbol with the following
statement: "[***] UBA unserviceable IAW CH-47-06-ASAM-01". Replace [***] with appropriate UBA (Fwd/Aft Pivot-
ing/Swiveling).
(2)  Remove and replace suspect UBA IAW TM 1-1520-240-23 (CH/MH-47D/F) or TM 1-1520-252-23 (MH-
47E/G), Chapter 7, as appropriate. Ensure replacement UBA complies with the requirements of this message.
d.  Clear the initial entry from para 4.a. and note compliance on DA Form 2408-5-1 (Fwd/Aft Pivoting/Swiveling
UBA).
8. PROCEDURES/INSTRUCTIONS FOR ASSEMBLIES/COMPONENTS/PARTS IN WORK OR IN STOCK (AT
ALL LEVELS INCLUDING WAR RESERVES). Annotate the serviceability tag with : "CH-47-06-ASAM-01, Upper
Boost Actuators, not complied with". Do not remove original condition tags.
a.  Items in Retail Stock Commanders and Facility Managers that maintain retail stock at installation level and
below will complete the following procedures.
(1)
Suspend issue of affected items until in compliance with message requirements.
(2)
Contact the supported aviation unit, as required, to perform the procedures required on affected items.
(3)
Comply with inspection and correction procedures as required to return items to serviceable stock.
(4)
Submit a Task/Inspection Report to Log POC IAW para 5.
b.
Items in Single Stock Fund and in Work (Overhaul/Repair Facility).
(1)  Depot, unit and other maintenance activity commanders will ensure items listed in para 3 are not issued
until they are in compliance with this message.
(2)
Submit Task/Inspection Compliance Report to Wholesale POC IAW para 5.
c.
Items in Wholesale Stock Depot storage facilities will complete the following procedures.
(1)
Suspend issue of affected items until in compliance with message requirements.
(2)
Submit Task/Inspection Compliance Report to Wholesale POC IAW para 5.
(3)  Comply with additional instructions provided by the Wholesale POC to return items to their original con-
dition code.
9. SPECIAL TOOLS AND FIXTURES REQUIRED. N/A.
4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business