|
|
TB 1-1520-240-20-162
(1) Discontinue all fluid sampling of the H-47 hydraulic system. The sampling is currently required IAW
CH-47-00-ASAM-03 (TB 1-1520-240-20-121), TM 55-1520-240-23-1, Task 1-92, Operating Time Special Inspection
10.2, and TM 1-1520-252-23-1, Task 1-100, Operating Time Special Inspection 2.2.
Change the CH-47D hydraulic fluid purification interval to 400 hours.
(2)
Hydraulic system filters will be replaced at system purification.
(3)
b.
Update appropriate TMs IAW para 12.2. of this message.
c. ULLS-A units may use this message as authority to delete Inspection Number A137 from the Inspection LCF
(DA Form 2408-18).
d. Manual record keepers may use this message as authority to delete the 50 hour Utility and Primary Hydraulic
Fluid Sample from the DA Form 2408-18.
e. Clear the initial entry from para 4.1. and note compliance on DA Form 2408-15, Historical Record For Aircraft.
8. PROCEDURES/INSTRUCTIONS FOR ASSEMBLIES/COMPONENTS/PARTS IN WORK OR IN STOCK (AT
ALL LEVELS INCLUDING WAR RESERVES). N/A.
9.
SPECIAL TOOLS AND FIXTURES REQUIRED.
N/A.
10.
SUPPLY/PARTS (REQUISITION/DISPOSITION).
N/A.
11.
MAINTENANCE APPLICATION.
a. Category of maintenance - AVUM.
b. Estimated time required - Total of 0.5 man-hours using 1 person with no "Not Mission Capable Maintenance"
(NMCM) time per end item.
12.
PUBLICATION REQUIREMENTS.
a. References:
(1)
AR 95-1.
(2)
DA Pam 738-751.
(3)
TM 1-1520-252-PM.
(4)
TM 1-1520-252-23.
(5)
TM 1-1520-272-23.
(6)
TM 1-1520-272-PM.
(7)
TM 55-1520-240-23.
(8) TM 55-1520-240-PM, Technical Manual Phase Maintenance Check List for Army CH-47D Helicopter,
25 May 2003.
(9)
TB 43-0211, Army Oil Analysis Program, 1 December 2004.
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |