Click here to make tpub.com your Home Page

Page Title: CAB CLEARANCE MARKER LIGHTS CABLE ASSEMBLY REPLACEMENT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
7-66. CAB CLEARANCE MARKER LIGHTS CABLE ASSEMBLY REPLACEMENT
This task covers:
a. Removal
c. Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Batteries disconnected (para 7-57).
Lockwire (Item 30, Appendix D)
PDP cover removed (para 16-2).
Lockwasher (10) (Item 82, Appendix G)
Lockwasher (2) (Item 88, Appendix G)
Gasket (5) (Item 24, Appendix G)
Tools and Special Tools
Tool Kit, Genl Mech (Item 46, Appendix C)
Wrench, Torque, 0-200 lb-in. (Item 59, Appendix C)
Socket Set, Socket Wrench (Item 34, Appendix C)
a. Removal.
(1) Remove three screws (1) and washers (2) from PDP (3).
(2) Remove three screws (4) from PDP (3).
(3) Lift PDP (3) outward to gain access.
(4) Remove two nuts (5), lockwashers (6), washers (7), and
cover (8) from terminal board TB1 (9).
Discard
(5) Disconnect terminal lug TL74 (10) from terminal board
TB1 (9) position 3.
(6) Disconnect terminal lug TL86 (11) from terminal board
TB2 (12) position 4.
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business