Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2920-225-34
Turn on IGNITION switch (1) and note reading on DC LOAD AND STARTER
1.
AMMETER (2) .
NOTE
DC LOAD AND STARTER AMMETER will read according
to the state of charge of test stand batteries. As
batteries become charged, reading will drop. Let test
stand run for about 5 minutes before going on with
test.
2.  If DC LOAD AND STARTER AMMETER (2) reads over 10 amperes, turn on
25A and 0-25A switches on LOAD BANK (3).
3.  If DC LOAD AND STARTER AMMETER (2) reads under 10 amperes, turn on
50A and 0-25A switches on LOAD BANK ( 3).
4.  Set MASTER LOAD switch (4) to ON position.
5.  Turn LOAD CURRENT CONTROL (5) slowly to the right until DC LOAD AND
STARTER AMMETER (2) reads 60 amperes. At this point, DC VOLTMETER
(6) must read about 28 volts and DC FIELD AND STARTER AMMETER (7)
must read one ampere or less.
6.  If DC FIELD AND BATTERY AMMETER (7) reads more than one ampere.
.
generator is nonrepairable.
END OF TASK
TA 103723
2-230

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business