|
|
TM 9-2815-210-34-2-2
FRAME
2
Soldier A 1.
Loosen eight bolts (1).
P u t chain sling (2) on two engine lifting brackets (3).
2.
U s i n g hoisting equipment, lift engine assembly (4) just enough
3.
t o take weight of engine off test stand (5).
Soldiers
4.
S l i d e engine assembly (4) about one foot to the front.
A and B
U s i n g hoisting equipment, let engine assembly (4) rest on test
Soldier A 5.
stand (5).
GO TO FRAME 3
6-65
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |