Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-210-34-2-2
FRAME
2
P l a c e main switch (1) in 24 VOLT position (2). Turn knob (3) on OVER-
1.
S P E E D GOVERNOR so that needle (4) points to 2900 RPM. Press RESET
button  (5).
Place SPEED METER RANGE switch (6) in HI rpm position.
2.
Place POWER METER RANGE switoh (7) in LO hp position.
3.
4.
C l o s e load control (8) by turning to right until it is finger tight.
5.
O p e n unload control (9) by turning to left.
6.
C h e c k and set throttle (10) so it will fully open and fully close engine
speed control.
GO TO FRAME 3
6-32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business