|
|
TM
9-2815-210-34-2-2
FRAME 2
NOTE
Tags and plugs put on during removal must be taken
off during replacement.
1.
P u t flame heater wiring harness (1) in place. Screw connector (2) onto fuel
supply solenoid valve (3).
2.
S c r e w connector (4) onto fuel return solenoid valve (5).
S c r e w connector (6) onto fuel pump (7).
3.
P u t in screw, nut, and lockwasher (9).
P u t ground lug (8) in place.
4.
GO TO FRAME 3
5-121
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |