|
|
TM 9-2815-210-34-2-2
FRAME
4
T u r n rheostat (1) until voltmeter (2) reads 24 volts. Pressure gage (3)
1.
should read 90 to 100 psi.
P u t bucket (4) under nozzle and check valve assembly (5) to catch discharged
2.
fuel.
T u r n adjustable valve (6) to give fuel flow to nozzle and check valve assembly
3.
(5).
C h e c k that spray pattern (7) is a uniform, fine spray cone with an angle of
4.
60 to 80.
G e t a new nozzle and check valve assembly (5) if there is no spray pattern or
5.
i f spray pattern is coarse or out of shape.
Turn off adjustable valve (6).
6.
Turn off rheostat (1).
7.
T u r n on adjustable valve (6) to bleed off pressure.
8.
END OF TASK
4-564
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |