Click here to make tpub.com your Home Page

Page Title: FRAME 3
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-210-34-2-2
FRAME 3
T u r n on rheostat (1) until voltmeter (2) reads 24 volts.
1.
T u r n on adjustable valve (3) until pressure gage (4) reads 5 to 10 psi.
2.
3.
C h e c k that nozzle and check valve assembly (5) inlet (6) and outlet (7) do not
l e a k . Get a new nozzle and check valve assembly if inlet or outlet leak.
Turn off adjustable valve (3).
4.
5.
Turn off rheostat (1).
6.
T a k e off nozzle and check valve assembly (5).
T u r n on adjustable valve (3) to bleed off pressure.
7.
END OF TASK
4-544

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business