|
|
TM 9-2815-210-34-2-2
FRAME 3
T u r n on rheostat (1) until voltmeter (2) reads 24 volts.
1.
T u r n on adjustable valve (3) until pressure gage (4) reads 5 to 10 psi.
2.
3.
C h e c k that nozzle and check valve assembly (5) inlet (6) and outlet (7) do not
l e a k . Get a new nozzle and check valve assembly if inlet or outlet leak.
Turn off adjustable valve (3).
4.
5.
Turn off rheostat (1).
6.
T a k e off nozzle and check valve assembly (5).
T u r n on adjustable valve (3) to bleed off pressure.
7.
END OF TASK
4-544
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |