|
|
TM 9-2815-210-34-2-2
FRAME 2
O p e n adjustable valve (1) and start fuel pump.
1.
K e e p valve (1) open until system is purged of air.
2.
Close valve (1).
3.
T u r n rheostat (2) until voltmeter (3) reads 24 volts.
4.
P r e s s u r e gage (4) should read 90 to 100 psi.
5.
T o set pressure, if necessary, loosen check valve locknut (5)' with wrench.
6.
T u r n relief valve adjusting screw (6) with screwdriver until pressure gage
reads 90 to 100 psi. H o l d relief valve adjusting screw with screwdriver and
t i g h t e n check valve locknut with wrench.
END OF TASK
4-534
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |