Click here to make tpub.com your Home Page

Page Title: FRAME 18
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-210-34-2-2
FRAME 18
NOTE
In machine shop, do this frame only if cylinder head is
t a g g e d for resurfacing.
If cylinder head is not tagged,
go to frame 19.
No more than a total of 0.005 inch can be machined off
g a s k e t surface of cylinder head (1). If cylinder head
h a s been resurfaced before, amount of metal machined
o f f is stamped or etched on front of cylinder head about
1 / 2 inch from gasket surface.
I n machine shop, resurface cylinder head (1) until no scratch or gouge is
1.
d e e p e r than 0.001 inch.  Resurface cylinder head until it is not out-of-flat
l e n g t h w i s e by more than 0.005 inch or out-of-flat crosswise by more than
0.003 inch.  If more than a total of 0.005 inch must be machined off to do this,
g e t a new cylinder head.
NOTE
If old cylinder head (1) can be resurfaced without
machining off more than a total of 0.005 inch, do step 2.
I n machine shop, add amount of metal just machined off cylinder head (1) to
2.
a m o u n t machined off before, and stamp or etch total on front of cylinder head
a b o u t 1/2 inch from gasket surface.
M e a s u r e thickness of cylinder head (1) from gasket surface to bottom of valve
3.
s p r i n g counterbores (2).  If thickness is less than 3.365 inches, get a new
cylinder head.
GO TO FRAME 19
4-229

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business