Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
(10) Install connector P135 (25) in left taillight carrier (26) with
spring washer (27) and nut (28).
(11) Install lanyard (29) on left taillight carrier (26) with spring
washer (30), screw (31), and nut (32).
(12) Install dust cap (33) on connector P135 (25).
(13) Install terminal lugs TL69 (34), TL17 (35), and TL67 (36)
on left taillight carrier (26) with lockwasher (37) and
screw (38).
(14) Connect crane junction box connector (39) to connector
P171 (40).
c. Follow-On Maintenance.
(1) Install kick panel (para 16-3).
(2) Connect batteries (para 7-57).
(3) Start engine (TM 9-2320-366-10-1).
(4) Check MHC operation (TM 9-2320-366-10-1).
(5) Shut down engine (TM 9-2320-366-10-1).
End of Task.
7-361/(7-362 Blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business