Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
7-34. M1089 WRECKER CONTROL PANEL TOGGLE SWITCH REPLACEMENT (CONT)
(9) Install control panel top cover (17) on WRECKER
CONTROL PANEL (7) with four washers (18), two
screws (19), and self-locking nuts (20).
(10) Install eight washers (21), lockwashers (22), and screws
(23) in control panel top cover (17).
c. Follow-On Maintenance.
(1) Connect batteries (para 7-57).
(2) Operate function of toggle switch that was
replaced (TM 9-2320-366-10-1) and check for proper
operation.
End of Task.
7-206

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business