TM 9-2320-366-20-3
(10) Install quick disconnect terminals (21) on ground strip
(12) positions 9 and 10.
(11) Install terminal lug (22) on terminal block (17) position 5
with screw (23).
(12) Install hoist up solenoid, hoist down solenoid, boom up
solenoid, and boom down solenoid cable assembly (24)
in junction box (1) with conduit nut (25).
(13) Install four quick disconnect terminals (26) on ground
strip (12) positions 16, 17, 18, and 19.
(14) Install four terminal lugs (27) on terminal block (17)
positions 13 through 16 with four screws (28).
7-175
|