Click here to make tpub.com your Home Page

Page Title: Installation. (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
7-27. M1084/M1086 JUNCTION BOX ASSEMBLY REPLACEMENT/REPAIR (CONT)
(11) Install system shutdown solenoid and boom up lockout
solenoid cable assembly (24) in junction box (1) conduit
nut (25).
(12) Connect two quick disconnect terminals (26) to ground
strip (13) positions 8 and 2.
(13) Install two terminal lugs (27) on terminal block (15)
position 28 and terminal block (21) position 12 with two
screws (28).
(14) Install hoist up solenoid, hoist down solenoid, boom up
solenoid, and boom down solenoid cable assembly (29)
in junction box (1) with conduit nut (30).
7-154

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business